Latency optimised network within South America, to Europe and USA.
Direct submarine cable route to Madrid, Spain (135ms); Amsterdam, Netherlands (170ms); Frankfurt, Germany (165ms) via EllaLink.
Direct cable terrestrial route to Santiago, Chile (40ms); Porto Alegre, Brazil (11ms); São Paulo, Brazil (26ms); Rio de Janeiro, Brazil (30ms); Buenos Aires, Argentina (12ms); Lima, Peru (68ms).
Low latency to United States via Miami (127ms) and Ashburn (137ms).